Credit for the next grid.

Mini-perm and construction-bridge facilities for solar, storage, EV, and grid-services projects across the Philippines, Malaysia, and Indonesia. Co-origination with institutional partners on utility-scale tickets.

Mini-perm

5–10 year construction-to-operate bridges

$1M – $25M

Facility size range

PH · MY · ID

Active jurisdictions

The bridge problem

Project-finance discipline, regional speed.

Solar, storage, EV, and grid-services projects with signed PPAs sit between bank-comfort thresholds and DFI ticket sizes. The contracted core is bankable; the construction window is short; institutional capital is regional. We bridge the gap with mini-perm and construction-bridge facilities, co-originated where the ticket needs partners.

Bridges + mini-perm

Project-finance structure, regional speed.

We underwrite to the contracted revenue series — signed PPA, EPC delivery, take-out commitment — and structure the bridge or mini-perm to fit the construction schedule.

Construction-bridge facility

Short-dated bridge against a signed PPA, EPC contract, and committed take-out. Drawdown matched to construction milestones; repayment from the take-out proceeds.

Mini-perm against signed PPAs

5–10 year facility for projects through commissioning and into early operating life — sized to the contracted offtake stream, not the equity sponsor.

Co-origination · utility scale

We bring institutional credit-fund partners to tickets above $25M and structure the senior tranche; sponsor retains the relationship.

Equipment & balance-of-plant term

Modules, inverters, storage, transformers, switchgear. Perfected first-lien against a documented BOM; LTV indexed to replacement cost and operating life.

How a project closes

Four steps to financial close.

  1. 01

    Project-shape call · 60 min

    Project structure, offtake, EPC, sponsor capacity, take-out. We map the financing perimeter against the construction schedule before opening a data room.

  2. 02

    Project diligence

    PPA terms, EPC contract, technology choice, interconnect, permits, sponsor financials, take-out commitment. Independent engineer review for facilities above $5M.

  3. 03

    Indicative term sheet

    Pricing references the contracted-revenue series; covenants reference DSCR and milestone delivery. Co-origination committee for tickets above $25M.

  4. 04

    Financial close · drawdown

    Local-counsel-led closing with project-finance documentation. Drawdown matched to construction milestones and certified completion events.

Ready to talk?

Bring us a signed PPA. We'll structure the bridge.

Mini-perm or construction-bridge — sized to the contracted revenue, not the equity sponsor.