Construction-bridge facility
Short-dated bridge against a signed PPA, EPC contract, and committed take-out. Drawdown matched to construction milestones; repayment from the take-out proceeds.
Beta coming soon
Mini-perm and construction-bridge facilities for solar, storage, EV, and grid-services projects across the Philippines, Malaysia, and Indonesia. Co-origination with institutional partners on utility-scale tickets.
Mini-perm
$1M – $25M
PH · MY · ID
The bridge problem
Solar, storage, EV, and grid-services projects with signed PPAs sit between bank-comfort thresholds and DFI ticket sizes. The contracted core is bankable; the construction window is short; institutional capital is regional. We bridge the gap with mini-perm and construction-bridge facilities, co-originated where the ticket needs partners.
Bridges + mini-perm
We underwrite to the contracted revenue series — signed PPA, EPC delivery, take-out commitment — and structure the bridge or mini-perm to fit the construction schedule.
Short-dated bridge against a signed PPA, EPC contract, and committed take-out. Drawdown matched to construction milestones; repayment from the take-out proceeds.
5–10 year facility for projects through commissioning and into early operating life — sized to the contracted offtake stream, not the equity sponsor.
We bring institutional credit-fund partners to tickets above $25M and structure the senior tranche; sponsor retains the relationship.
Modules, inverters, storage, transformers, switchgear. Perfected first-lien against a documented BOM; LTV indexed to replacement cost and operating life.
How a project closes
Project-shape call · 60 min
Project structure, offtake, EPC, sponsor capacity, take-out. We map the financing perimeter against the construction schedule before opening a data room.
Project diligence
PPA terms, EPC contract, technology choice, interconnect, permits, sponsor financials, take-out commitment. Independent engineer review for facilities above $5M.
Indicative term sheet
Pricing references the contracted-revenue series; covenants reference DSCR and milestone delivery. Co-origination committee for tickets above $25M.
Financial close · drawdown
Local-counsel-led closing with project-finance documentation. Drawdown matched to construction milestones and certified completion events.
Ready to talk?
Mini-perm or construction-bridge — sized to the contracted revenue, not the equity sponsor.
Essential cookies for sign-in, security, and language. With consent, product analytics too. Read more.